Mark phase3 closeout gate 3 complete after two canary=all GOOSE_V149_PHASE3_OK runs and refresh baseline evidence from run3.
Co-authored-by: Cursor <cursoragent@cursor.com>
Fix build-goosed-v149-local.sh vendor/v8 paths after cd into the v149 worktree,
record phase3/memory drift evidence, and update phase3 closeout gate status.
Co-authored-by: Cursor <cursoragent@cursor.com>
Use the default headroom health probe instead of the goosed fetch adapter
so active mode routes deepseek-no-think through the proxy, and add an E2E
script that verifies goosed pong via headroom with fail-open portal checks.
Co-authored-by: Cursor <cursoragent@cursor.com>
Portal resume smoke can exceed 300s when agent-run worker is busy; raise
phase3 default to 600s and refresh memory/sanitize baselines from smoke.
Co-authored-by: Cursor <cursoragent@cursor.com>
Wire Portal and TKMind proxy to loopback Goose v1.49 via canary env blocks,
with verification scripts, Phase 2/3 evidence baselines, and rollback runbooks
so local upgrade stays isolated from stable 1.41 and production.
Co-authored-by: Cursor <cursoragent@cursor.com>